Whether one requires military and defense parts, aerospace parts, or other such items, there is no better purchasing platform than Jet Parts 360, an ASAP Semiconductor website. You have taken interest in part number CK-104 LONG LEAD, which is manufactured by Crl Components Inc under the CAGE Code 71590 and listed with the item name “Capacitor Fixed Ceramic Dielectr.” If you would like to receive procurement options for this listing, please fill out and submit the form on this page with as much information as you can regarding your needs. Our staff will then use details like your desired quantity and target pricing to formulate a customized solution that caters to you.
This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/terms-conditions.aspx . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without CAGE code 6RE77 is void.
You can mail your Bill of Materials (BOM) to sales@jetparts360.com. Please do not hesitate to contact us if you have any additional questions. With over 50,000 manufacturers and 20 million unique part numbers we are a one stop shop for all aerospace and aviation requirements. Feel free to browse our website, JetParts360.com for any additional parts that you might require or download the ASAP Semiconductor App on the Google Play store. We are available 24/7 at +1-714-705-4780.
To ensure that customers easily locate the various military jet parts, NSN items, and aerospace parts their operations demand, we list all offerings with as much relevant information as we can. For example, part number CK-104 LONG LEAD is organized under NSN 5910-00-113-5499, meaning that its NIIN is 001135499. Furthermore, the first four digits of the NSN indicate that the item belongs to FSC 5910 Capacitors. Using these details, you can both verify that part number CK-104 LONG LEAD is the exact item you require and seamlessly search for related options as needed. With all that we do to simplify procurement for our customers, be sure to choose us for all your operational requirements.
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | WO MTG FACILITIES TERMINALS ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0 0010 |
ABJT | TERMINAL LENGTH | 1 250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0 290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0 290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0 090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0 200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0 025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODES |
AGAV | END ITEM IDENTIFICATION | MULTIPLE LAUNCH ROCKET SYSTEM MLRS |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000 0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0 100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25 0 TO 15 0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55 0 DEG CELSIUS MINIMUM AND 125 0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100 0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10 00 TO 10 00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000 0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2 5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION INCLUDES ENGINEERING TYPE BULLETINS BROCHURESETC THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT EXCLUDES COMMERCIAL CATALOGS INDUSTRY DIRECTORIES AND SIMILAR TRADE PUBLICATIONS REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATIONSTANDARD DATA | 81349-MIL-C-390142 GOVERNMENT SPECIFICATION |
End Use : 20005 | Electric apparatus |
---|---|
Schedule B : 8532290040 (NAICS 334416) | Fixed capacitors, nesoi |
SITC : 77867 | Fixed capacitors, n.E.S. |
ADPE | Represents items with no adp components |
---|---|
CRITL | The item is specifically designed to be or selected as being nuclear hard (i.E., it will continue to perform its designed function in an environment created by a nuclear explosion). the item does not have other critical features. |
ESD | A - No known electrostatic discharge (esd) or electromagnetic interference (emi) sensitivity. |
HMIC | P - Indicates there is no information in the hmirs. The nsn is in a fsc in table ii of federal standard 313 and a msds may be required by the user. The requirement for a msds is dependent on a hazard determination of the supplier or the intended end use of item. |
PMIC | A - Item does not contain precious metal. |
AAC | D |
---|---|
Classification Control | U |
MGMT_CTL | Q2200x- |
Quantity per pack | 5 |
Repariability | This is a nonreparable item. if condemned or economically unserviceable, then dispose at the level authorized replace the item. |
Shelf Life | N/A |
SOS | Sms |
Unit of Measure | Ea |
ACC: | H - Instruments/equipment/supplies for radio, communications, electrical, laboratory, etc. (includes signal corps) |
---|---|
ADC: | A - Shipment is not a consolidation and does not exceed 84 inches in any dimension. |
LTL: | P - 77.5 |
NMFC: | 061400 - Condensers/parts noi/capacitors |
SHC: | 9 - Other or no special handling required (sh) |
TCC: | Z - No special type of cargo code applicable |
WCC: | 72D - Communications/electronics, other than sigint/ew or comsec repair parts and components |
Guaranteed on-time |
|
Customized and |
|
Over 5100 |
|
Complete Purchasing |
We Hope You'll Choose Us to Fulfill Your AOG Needs In the Future. We’Re Always Ready to Serve, 24/7, 365 Days A Year.
Request for Quote