Quote for DD101 LONG LEAD NSN part manufactured by Crl Components Inc with NSN 5910-00-678-8157

Part Number:   DD101 LONG LEAD
Alternate P/N:  DD101 LONG LEAD
Manufacturer:  Crl Components Inc
NSN:  5910006788157
NIIN:  006788157
CAGE Code:  71590
FSG:  59 Electrical and Electronic Equipment Components
INC Code:  00007
Country:  USA
NCB Code:  00

Whether one requires military and defense parts, aerospace parts, or other such items, there is no better purchasing platform than Jet Parts 360, an ASAP Semiconductor website. You have taken interest in part number DD101 LONG LEAD, which is manufactured by Crl Components Inc under the CAGE Code 71590 and listed with the item name “Capacitor Fixed Ceramic Dielectr.” If you would like to receive procurement options for this listing, please fill out and submit the form on this page with as much information as you can regarding your needs. Our staff will then use details like your desired quantity and target pricing to formulate a customized solution that caters to you.

Note : We Will Not Share Your Information To Any Third Parties.

Please fill out below form for DD101 LONG LEAD

Contact Information

“*” Required Fields Are Compulsory
 * By clicking this box, I acknowledge that I have read and accept the ASAP Semiconductor Terms and Conditions and agree that all quotes and purchase orders are exclusively subject to the ASAP Semiconductor Terms and Conditions.
  • I consent to receive email communications from ASAP Semiconductor and can unsubscribe at any time.
  • ASAP Semiconductor is a wholly independent aftermarket parts distributor.
  • This website is intended for quotations based on part numbers only. Please DO NOT submit drawings, technical data, or other specifications through this portal.

This is a quotation for the goods listed above. This quotation is meant as an estimate and does not reflect a final bill or invoice. All quotations are subject to change until acceptance by ASAP Semiconductor of a binding Purchase Order, and quotations may be withdrawn or revised at the sole discretion of ASAP Semiconductor. This quotation is subject to the ASAP Semiconductor Terms & Conditions available at https://www.asapsemi.com/terms-conditions.aspx . All United States Government and Department of Defense bids are quoted as CAGE code 6RE77 from ASAP Semiconductor’s Anaheim, California facility. Any quotation from ASAP Semiconductor without CAGE code 6RE77 is void.

You can mail your Bill of Materials (BOM) to sales@jetparts360.com. Please do not hesitate to contact us if you have any additional questions. With over 50,000 manufacturers and 20 million unique part numbers we are a one stop shop for all aerospace and aviation requirements. Feel free to browse our website, JetParts360.com for any additional parts that you might require or download the ASAP Semiconductor App on the Google Play store. We are available 24/7 at +1-714-705-4780.

To ensure that customers easily locate the various military jet parts, NSN items, and aerospace parts their operations demand, we list all offerings with as much relevant information as we can. For example, part number DD101 LONG LEAD is organized under NSN 5910-00-678-8157, meaning that its NIIN is 006788157. Furthermore, the first four digits of the NSN indicate that the item belongs to FSC 5910 Capacitors. Using these details, you can both verify that part number DD101 LONG LEAD is the exact item you require and seamlessly search for related options as needed. With all that we do to simplify procurement for our customers, be sure to choose us for all your operational requirements.

NSN Information for Part Number DD101 LONG LEAD with NSN 5910-00-678-8157, 5910006788157

NSNFSCNIINCLSHazmatDEMILCancelled NSN
5910-00-678-8157

Item Description:

Capacitorfixedceramic Dielectr

59100067881570P 5910007524896
CIICHCCESDPMICCriticalityENAC
U A0
Part NumberISCRNVCRNCCHCCMSDSSADC
838-000x5u0-101k395

Characteristics Data of NSN 5910-00-678-8157, 5910006788157

MRCCriteriaCharacteristic
AAQLBODY STYLEWO MTG FACILITIES RADIAL TERMINALS
AARGRELIABILITY INDICATORNOT ESTABLISHED
ABJTTERMINAL LENGTH1 500 INCHES MINIMUM
ABPMBODY DIAMETER0 290 INCHES MAXIMUM
ADAQBODY LENGTH0 156 INCHES MAXIMUM
AEBSCENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER0 250 INCHES NOMINAL
AEBTTERMINAL DIAMETER0 025 INCHES NOMINAL
AEBZSCHEMATIC DIAGRAM DESIGNATORNO COMMON OR GROUNDED ELECTRODES
AGAVEND ITEM IDENTIFICATIONMISSILE AI-TO-AIR PHOEBNIX AIM-54 TELETYPE MODEL 28 TEST CONSOLES MINI-SACE ENGINE AIRCRAFT TF33-PW-102 C-135E EC-135HKP MISSILE AIR-TO-AIR SPARROW AIM-7 SUPPORT EQUIPMENT MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT B-
CQBQCAPACITANCE VALUE PER SECTION100 000 PICOFARADS SINGLE SECTION
CQFBVOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE-56 022 0 WITHOUT VOLTAGE APPLIED SINGLE SECTION
CQJJNONDERATED OPERATING TEMP-55 0 DEG CELSIUS MINIMUM AND 85 0 DEG CELSIUS MAXIMUM
CQWMNONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION1000 0 DC SINGLE SECTION
CRTLCRITICALITY CODE JUSTIFICATIONFEAT
CRTPTOLERANCE RANGE PER SECTION-10 0010 00 PERCENT SINGLE SECTION
CWJKCASE MATERIALPLASTIC
CWPKINSULATION RESISTANCE AT REFERENCE TEMP10000 0 MEGOHMS
CWSGTERMINAL SURFACE TREATMENTSOLDER
FEATSPECIAL FEATURESWEAPON SYSTEM ESSENTIAL
TTQYTERMINAL TYPE AND QUANTITY2 UNINSULATED WIRE LEAD

Schedule B & Trade

End Use : 20005 Electric apparatus
Schedule B : 8532290040 (NAICS 334416) Fixed capacitors, nesoi
SITC : 77867 Fixed capacitors, n.E.S.

Identification

ADPE Represents items with no adp components
CRITL The item does not have a nuclear hardened feature but does have other critical featur (s) such as tolerance, fit restrictions or application.
HMIC P - Indicates there is no information in the hmirs. The nsn is in a fsc in table ii of federal standard 313 and a msds may be required by the user. The requirement for a msds is dependent on a hazard determination of the supplier or the intended end use of item.
PMIC A - Item does not contain precious metal.

NSN Management Codes

AAC Z
Classification Control U
MGMT_CTL Q22tpx-
Quantity per pack 5
Repariability This is a nonreparable item. if condemned or economically unserviceable, then dispose at the level authorized replace the item.
Shelf Life N/A
SOS Sms
Unit of Measure Ea

Freight Information

ACC: H - Instruments/equipment/supplies for radio, communications, electrical, laboratory, etc. (includes signal corps)
ADC: A - Shipment is not a consolidation and does not exceed 84 inches in any dimension.
LTL: P - 77.5
NMFC: 061400 - Condensers/parts noi/capacitors
SHC: 9 - Other or no special handling required (sh)
TCC: Z - No special type of cargo code applicable
WCC: 72D - Communications/electronics, other than sigint/ew or comsec repair parts and components
USA Flag

We are proud to supply every branch of the United States military

Why Choose Us

Guaranteed on-time
Delivery

Customized and
User-friendly Database

Over 5100
Manufacturers

Complete Purchasing
Solutions

ASAP Semiconductor’s Certifications and Memberships


Thank You for Visiting!

We Hope You'll Choose Us to Fulfill Your AOG Needs In the Future. We’Re Always Ready to Serve, 24/7, 365 Days A Year.

Request for Quote

We use cookies to ensure that we give you the great experience on our website. If you continue to use this site we will assume that you are happy with it.

bottom to top